Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19809 |
Ähnliche Einträge
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
von: Brac University
Veröffentlicht: (2023) -
Initial observation on the BMS system design drawings and BOQ
von: Brac University
Veröffentlicht: (2023) -
Request to release balance amount under BOQ 3.6
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Observation on the electrical design drawings and BoQ
von: Brac University
Veröffentlicht: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
von: Brac University
Veröffentlicht: (2023)