Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19809 |
Ítems similars
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
per: Brac University
Publicat: (2023) -
Initial observation on the BMS system design drawings and BOQ
per: Brac University
Publicat: (2023) -
Request to release balance amount under BOQ 3.6
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Observation on the electrical design drawings and BoQ
per: Brac University
Publicat: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
per: Brac University
Publicat: (2023)