Submitting final design, drawing and BOQ of facade immediately
This record consists of general correspondence regarding submitting final design, drawing and BOQ of facade immediately of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19809 |
مواد مشابهة
-
Submitting Final design, drawing and BOQ of facade within 20.02.2020
بواسطة: Brac University
منشور في: (2023) -
Initial observation on the BMS system design drawings and BOQ
بواسطة: Brac University
منشور في: (2023) -
Request to release balance amount under BOQ 3.6
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Observation on the electrical design drawings and BoQ
بواسطة: Brac University
منشور في: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
بواسطة: Brac University
منشور في: (2023)