Instruction to take adequate safety measures on the pedestrian walkway at east side
This record consists of general correspondence regarding instruction to take adequate safety measures on the pedestrian walkway at east side of BRAC University new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19806 |
Documenti analoghi
-
Instruction to take immediate measures on safety and security
di: Brac University
Pubblicazione: (2023) -
Instruction to take immediate measures on safety and security
di: Brac University
Pubblicazione: (2023) -
Reluctance to take safety measures and absence from the safety meetings
di: Brac University
Pubblicazione: (2023) -
Instruction to ensure safety & security at BRAC University new campus project
di: Brac University
Pubblicazione: (2023) -
Instruction to ensure safety & security at BRACU new campus project (Edgeworks Limited)
di: Brac University
Pubblicazione: (2023)