Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19805 |
Схожі ресурси
-
Electrical BBT system drawing
за авторством: WOHA Designs PTE LTD, та інші
Опубліковано: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
за авторством: Brac University
Опубліковано: (2023) -
Instruction to start the work of BBT at BRACU new campus project
за авторством: Brac University
Опубліковано: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
за авторством: Brac University
Опубліковано: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
за авторством: Brac University
Опубліковано: (2023)