Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19805 |
Benzer Materyaller
-
Electrical BBT system drawing
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work of BBT at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)