Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19805 |
Схожие документы
-
Electrical BBT system drawing
по: WOHA Designs PTE LTD, и др.
Опубликовано: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
по: Brac University
Опубликовано: (2023) -
Instruction to start the work of BBT at BRACU new campus project
по: Brac University
Опубликовано: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
по: Brac University
Опубликовано: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
по: Brac University
Опубликовано: (2023)