Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19805 |
Registros relacionados
-
Electrical BBT system drawing
por: WOHA Designs PTE LTD, et al.
Publicado em: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
por: Brac University
Publicado em: (2023) -
Instruction to start the work of BBT at BRACU new campus project
por: Brac University
Publicado em: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
por: Brac University
Publicado em: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
por: Brac University
Publicado em: (2023)