Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19805 |
Gelijkaardige items
-
Electrical BBT system drawing
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
door: Brac University
Gepubliceerd in: (2023) -
Instruction to start the work of BBT at BRACU new campus project
door: Brac University
Gepubliceerd in: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
door: Brac University
Gepubliceerd in: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
door: Brac University
Gepubliceerd in: (2023)