Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19805 |
類似資料
-
Electrical BBT system drawing
著者:: WOHA Designs PTE LTD, 等
出版事項: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Instruction to start the work of BBT at BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
著者:: Brac University
出版事項: (2023)