Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
מחבר ראשי: | Brac University |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/19805 |
פריטים דומים
-
Electrical BBT system drawing
מאת: WOHA Designs PTE LTD, et al.
יצא לאור: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
מאת: Brac University
יצא לאור: (2023) -
Instruction to start the work of BBT at BRACU new campus project
מאת: Brac University
יצא לאור: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
מאת: Brac University
יצא לאור: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
מאת: Brac University
יצא לאור: (2023)