Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Autor Principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/19805 |
Títulos similares
-
Electrical BBT system drawing
por: WOHA Designs PTE LTD, et al.
Publicado: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
por: Brac University
Publicado: (2023) -
Instruction to start the work of BBT at BRACU new campus project
por: Brac University
Publicado: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
por: Brac University
Publicado: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
por: Brac University
Publicado: (2023)