Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19805 |
Míreanna comhchosúla
-
Electrical BBT system drawing
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work of BBT at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023)