Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19805 |
Documents similaires
-
Electrical BBT system drawing
par: WOHA Designs PTE LTD, et autres
Publié: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
par: Brac University
Publié: (2023) -
Instruction to start the work of BBT at BRACU new campus project
par: Brac University
Publié: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
par: Brac University
Publié: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
par: Brac University
Publié: (2023)