Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
Κύριος συγγραφέας: | Brac University |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19805 |
Παρόμοια τεκμήρια
-
Electrical BBT system drawing
ανά: WOHA Designs PTE LTD, κ.ά.
Έκδοση: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
ανά: Brac University
Έκδοση: (2023) -
Instruction to start the work of BBT at BRACU new campus project
ανά: Brac University
Έκδοση: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
ανά: Brac University
Έκδοση: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
ανά: Brac University
Έκδοση: (2023)