Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19805 |
مواد مشابهة
-
Electrical BBT system drawing
بواسطة: WOHA Designs PTE LTD, وآخرون
منشور في: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work of BBT at BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
بواسطة: Brac University
منشور في: (2023)