Instruction to start the work at BRACU new campus project (BBT system)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of Busbar Trunking (BBT) System for BRACU new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/19805 |
相似书籍
Instruction to start the work at BRACU new campus project (Substation)
由: Brac University
出版: (2023)
由: Brac University
出版: (2023)
相似书籍
-
Electrical BBT system drawing
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
由: Brac University
出版: (2023) -
Instruction to start the work of BBT at BRACU new campus project
由: Brac University
出版: (2023) -
Minutes of pre-bid meeting with the bidders of Busbar Trunking (BBT) system for BRACU new campus project
由: Brac University
出版: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
由: Brac University
出版: (2023)