Regarding issues that affect the execution of permanent retaining wall
This record consists of general correspondence regarding issues that affect the execution of permanent retaining wall of BRAC University new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19803 |
Samankaltaisia teoksia
-
Regarding issues that affect the execution of permanent retaining wall
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
Waterproofing for retaining wall
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023)