Submission of detailed consumption breakdown for the delivered cement
This record consists of general correspondence regarding the submission of detailed consumption breakdown for the delivered cement of BRACU new campus project site.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19801 |
Similar Items
-
Submission of detailed consumption breakdown for the delivered cement
od: Brac University
Izdano: (2023) -
Request ot submit consumption breakdown of delivered cement in our prescribed form
od: Brac University
Izdano: (2023) -
Submission of detailed consumption breakdown for the delivered OPC bulk cement
od: Brac University
Izdano: (2023) -
Submission of the cement consumption breakdown reports of BRAC University new campus project
od: BUCG-ABC Joint Venture
Izdano: (2023) -
Submission of material consumption statement with each RA bill
od: Brac University
Izdano: (2023)