Submission of detailed consumption breakdown for the delivered cement
This record consists of general correspondence regarding the submission of detailed consumption breakdown for the delivered cement of BRACU new campus project site.
Autor Principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/19801 |
Títulos similares
-
Submission of detailed consumption breakdown for the delivered cement
por: Brac University
Publicado: (2023) -
Request ot submit consumption breakdown of delivered cement in our prescribed form
por: Brac University
Publicado: (2023) -
Submission of detailed consumption breakdown for the delivered OPC bulk cement
por: Brac University
Publicado: (2023) -
Submission of the cement consumption breakdown reports of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Submission of material consumption statement with each RA bill
por: Brac University
Publicado: (2023)