Submission of detailed consumption breakdown for the delivered cement
This record consists of general correspondence regarding the submission of detailed consumption breakdown for the delivered cement of BRACU new campus project site.
Hlavní autor: | Brac University |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/19801 |
Podobné jednotky
-
Submission of detailed consumption breakdown for the delivered cement
Autor: Brac University
Vydáno: (2023) -
Request ot submit consumption breakdown of delivered cement in our prescribed form
Autor: Brac University
Vydáno: (2023) -
Submission of detailed consumption breakdown for the delivered OPC bulk cement
Autor: Brac University
Vydáno: (2023) -
Submission of the cement consumption breakdown reports of BRAC University new campus project
Autor: BUCG-ABC Joint Venture
Vydáno: (2023) -
Submission of material consumption statement with each RA bill
Autor: Brac University
Vydáno: (2023)