The engineer's instruction to submit organogram of BUCG-ABC JV
This record consists of general correspondence regarding the engineer's instruction to submit organogram of BUCG-ABC JV of BRACU new campus project site.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19786 |
مواد مشابهة
-
The engineer's instruction to submit organogram at BUCG-ABC JV
بواسطة: Brac University
منشور في: (2023) -
The engineer's instruction to submit organogram at BUCG-ABC Joint Venture
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
The Interim application of EOT from 23” April, 2018 to 20''‘ map 2018 our Ref: BUCG-ABC JV-JAA-014
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
BUCG-ABC JV cashflow calculation
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Invoice of utility bill reimbursement from BUCG-ABC JV
بواسطة: Brac University
منشور في: (2023)