The engineer's instruction to provide the wall and floor penetration,opening, sleeve,groove etc. as per drawings
This record consists of general correspondence regarding the the engineer's instruction to provide the wall and floor penetration ,opening, sleeve, groove etc. as per drawings of BRACU new campus project site.
מחבר ראשי: | Brac University |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/19780 |
פריטים דומים
-
Purchase order for supply, installation and testing of the IT floor trunk, conduit, and groove cutting in the recessed area in different floor of BracU new campus building
מאת: Brac University
יצא לאור: (2023) -
Issue about finishing the floor works on 4th & 5th floor
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Floor, wall & ceiling interface details (Architectural Consultant Drawings)
מאת: WOHA Designs PTE LTD
יצא לאור: (2023) -
Wall & floor punch location & dimension layout for basement plan
מאת: Electro-Mechanical Control Services (EMCS)
יצא לאור: (2023) -
Details of floor finish plan (Architectural As Built Drawings)
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2024)