The engineer's instruction to provide the wall and floor penetration,opening, sleeve,groove etc. as per drawings
This record consists of general correspondence regarding the the engineer's instruction to provide the wall and floor penetration ,opening, sleeve, groove etc. as per drawings of BRACU new campus project site.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19780 |
Documents similaires
-
Purchase order for supply, installation and testing of the IT floor trunk, conduit, and groove cutting in the recessed area in different floor of BracU new campus building
par: Brac University
Publié: (2023) -
Issue about finishing the floor works on 4th & 5th floor
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Floor, wall & ceiling interface details (Architectural Consultant Drawings)
par: WOHA Designs PTE LTD
Publié: (2023) -
Wall & floor punch location & dimension layout for basement plan
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Details of floor finish plan (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024)