Instruction to start the work at BRACU new campus project (MDB & DB)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of electrical system (MDB & DB) for BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19774 |
Benzer Materyaller
-
Instruction to start the work of MDB & DB at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Full set electrical plan with MDB and DB system
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Design process of MDB & BMS system
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work at BRACU new campus project (HVAC)
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)