Instruction to start the work at BRACU new campus project (MDB & DB)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of electrical system (MDB & DB) for BRACU new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19774 |
Podobne zapisy
-
Instruction to start the work of MDB & DB at BRACU new campus project
od: Brac University
Wydane: (2023) -
Full set electrical plan with MDB and DB system
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
Design process of MDB & BMS system
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Instruction to start the work of HVAC at BRACU new campus project
od: Brac University
Wydane: (2023) -
Instruction to start the work at BRACU new campus project (HVAC)
od: Brac University
Wydane: (2023)