Design coordination and assurance for awarding other services as single source
This record consists of general correspondence regarding the design coordination and assurance for awarding other services as single source of BRACU new campus project site.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19761 |
Podobne zapisy
-
Re: Reminder of submitting the coordinated drawing on M&E design
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Pending issues of design coordination for 1F-3F construction of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Regarding shop drawing coordination meeting
od: Brac University
Wydane: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub clause 8.1 & 15.1
od: Brac University
Wydane: (2023) -
Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
od: Brac University
Wydane: (2023)