Confirmation to manufacture north zone escalator from B1 to Level 10

This record consists of general correspondence regarding the confirmation to manufacture north zone escalator from B1 to Level 10 of BRACU new campus building.

Detaylı Bibliyografya
Yazar: Brac University
Materyal Türü: General correspondence
Dil:English
Baskı/Yayın Bilgisi: Brac University 2023
Konular:
Online Erişim:http://hdl.handle.net/10361/19757