Revised IFC drawings impact to the construction period
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/19756 |
相似书籍
-
The status of MEP IFC drawing
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
IFC drawing queries
由: Brac University
出版: (2023) -
Work interface of high voltage electrical and IFC drawing
由: Brac University
出版: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)