Revised IFC drawings impact to the construction period
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19756 |
Registros relacionados
-
The status of MEP IFC drawing
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
IFC drawing queries
por: Brac University
Publicado em: (2023) -
Work interface of high voltage electrical and IFC drawing
por: Brac University
Publicado em: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)