Revised IFC drawings impact to the construction period
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site.
Autor principal: | |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19756 |
id |
10361-19756 |
---|---|
record_format |
dspace |
spelling |
10361-197562023-08-24T21:02:29Z Revised IFC drawings impact to the construction period Brac University New campus project General correspondence Construction period IFC drawings This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site. 2023-08-24T05:28:45Z 2023-08-24T05:28:45Z ©2019 2019-07-18 General correspondence No. BRACU-NCP/2019/76A http://hdl.handle.net/10361/19756 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Construction period IFC drawings |
spellingShingle |
New campus project General correspondence Construction period IFC drawings Brac University Revised IFC drawings impact to the construction period |
description |
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site. |
format |
General correspondence |
author |
Brac University |
author_facet |
Brac University |
author_sort |
Brac University |
title |
Revised IFC drawings impact to the construction period |
title_short |
Revised IFC drawings impact to the construction period |
title_full |
Revised IFC drawings impact to the construction period |
title_fullStr |
Revised IFC drawings impact to the construction period |
title_full_unstemmed |
Revised IFC drawings impact to the construction period |
title_sort |
revised ifc drawings impact to the construction period |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/19756 |
work_keys_str_mv |
AT bracuniversity revisedifcdrawingsimpacttotheconstructionperiod |
_version_ |
1814308704746471424 |