Confirmation to start manufacturing of north zone escalator from level 10 to roof (01 pair)
This record consists of general correspondence regarding the confirmation to start manufacturing of north zone escalator from level 10 to roof of BRACU new campus building.
المؤلف الرئيسي: | |
---|---|
التنسيق: | General correspondence |
اللغة: | Spanish / Castilian |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19755 |