Instruction to start the work at BRACU new campus project (Fire doors)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of fore doors for BRACU new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19752 |
Podobne zapisy
-
Instruction to start the work of fire doors at BRACU new campus project
od: Brac University
Wydane: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
od: Brac University
Wydane: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
od: Brac University
Wydane: (2023) -
Minutes of pre-bid meeting with the bidders of fire door for BRACU new campus project
od: Brac University
Wydane: (2023) -
Instruction to ensure safety & security at BRACU new campus project (BTCL)
od: Brac University
Wydane: (2023)