Reminder letter for submitting complete M&E design to WOHA & Transsolar
This record consists of general correspondence regarding reminder letter for submitting complete M&E design to WOHA & Transsolar for BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19748 |
مواد مشابهة
-
Completing all the M & E design immediately to be reviewed by TRANSSOLAR
بواسطة: Brac University
منشور في: (2023) -
Completing all the M&E design immediately to be reviewed by Transsolar
بواسطة: Brac University
منشور في: (2023) -
Re: All the M&E design immediately to be reviewed by the Transsolar
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Reminder for submitting the coordinated drawing on M & E design of BRACU new campus
بواسطة: Brac University
منشور في: (2023) -
Re: Completing all the M&E design immediately to be reviewed by Transsolar
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)