Postponing some services from the design services of BUCG
This record consists of general correspondence regarding the postponement of some design services of BUCG, the contractor of BRACU new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19741 |
Samankaltaisia teoksia
-
Request of closing the outstanding issues of design services of BUCG
Tekijä: Brac University
Julkaistu: (2023) -
Postponing some services from the design services of BUCG
Tekijä: BUCG
Julkaistu: (2023) -
Request of closing the outstanding issues of design services of BUCG
Tekijä: Brac University
Julkaistu: (2023) -
Request of closing the outstanding issues of design services of BUCG
Tekijä: Brac University
Julkaistu: (2023) -
Request of closing the outstanding issues of design services of BUCG
Tekijä: BUCG
Julkaistu: (2023)