Time extension of design change for 6th-8th floor of BRAC University new campus project
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19727 |
Những quyển sách tương tự
-
Time extension of design change for 6th-8th floor
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Time extension of design change for 6th-8th floor
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Request for time extension
Bằng: Adex Corporation Ltd.
Được phát hành: (2023) -
Extension of time to submit quotation for carryout the works under variations or extra works
Bằng: Brac University
Được phát hành: (2023) -
Request for time extension due to flush valve issue
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)