Time extension of design change for 6th-8th floor of BRAC University new campus project
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19727 |
Registros relacionados
-
Time extension of design change for 6th-8th floor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Time extension of design change for 6th-8th floor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Request for time extension
por: Adex Corporation Ltd.
Publicado em: (2023) -
Extension of time to submit quotation for carryout the works under variations or extra works
por: Brac University
Publicado em: (2023) -
Request for time extension due to flush valve issue
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)