Time extension of design change for 6th-8th floor of BRAC University new campus project
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19727 |
Podobne zapisy
-
Time extension of design change for 6th-8th floor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Time extension of design change for 6th-8th floor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Request for time extension
od: Adex Corporation Ltd.
Wydane: (2023) -
Extension of time to submit quotation for carryout the works under variations or extra works
od: Brac University
Wydane: (2023) -
Request for time extension due to flush valve issue
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)