Time extension of design change for 6th-8th floor of BRAC University new campus project

This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.

书目详细资料
主要作者: Brac University
格式: General correspondence
语言:English
出版: Brac University 2023
主题:
在线阅读:http://hdl.handle.net/10361/19727
id 10361-19727
record_format dspace
spelling 10361-197272023-08-24T21:02:50Z Time extension of design change for 6th-8th floor of BRAC University new campus project Brac University New campus project General correspondence Design change Time extension This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project. 2023-08-24T04:32:10Z 2023-08-24T04:32:10Z ©2020 2020-07-07 General correspondence Ref. no.: BRACU-NCP/2020/80A http://hdl.handle.net/10361/19727 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
General correspondence
Design change
Time extension
spellingShingle New campus project
General correspondence
Design change
Time extension
Brac University
Time extension of design change for 6th-8th floor of BRAC University new campus project
description This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.
format General correspondence
author Brac University
author_facet Brac University
author_sort Brac University
title Time extension of design change for 6th-8th floor of BRAC University new campus project
title_short Time extension of design change for 6th-8th floor of BRAC University new campus project
title_full Time extension of design change for 6th-8th floor of BRAC University new campus project
title_fullStr Time extension of design change for 6th-8th floor of BRAC University new campus project
title_full_unstemmed Time extension of design change for 6th-8th floor of BRAC University new campus project
title_sort time extension of design change for 6th-8th floor of brac university new campus project
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/19727
work_keys_str_mv AT bracuniversity timeextensionofdesignchangefor6th8thfloorofbracuniversitynewcampusproject
_version_ 1814307210229972992