Regarding post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding post level survey of the building or at least near the escalator opening area in all the floors of BRAC University new campus project.
Autor Principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/19726 |
Títulos similares
-
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Submitting post level survey of the completed structure
por: Brac University
Publicado: (2023) -
The survey kit : how to analyze survey data /
por: Fink, Arlene
Publicado: (1995) -
Escalators (Architectural Consultant Drawings)
por: WOHA Designs PTE LTD
Publicado: (2023) -
Upturn wall near the escalator void at roof level (RFA-532_Rev.A)
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)