Regarding post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding post level survey of the building or at least near the escalator opening area in all the floors of BRAC University new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19726 |
Míreanna comhchosúla
-
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Submitting post level survey of the completed structure
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
The survey kit : how to analyze survey data /
de réir: Fink, Arlene
Foilsithe / Cruthaithe: (1995) -
Escalators (Architectural Consultant Drawings)
de réir: WOHA Designs PTE LTD
Foilsithe / Cruthaithe: (2023) -
Upturn wall near the escalator void at roof level (RFA-532_Rev.A)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)