Confirmation of high voltage electrical conduit work in basement
This record consists of general correspondence regarding the confirmation of high voltage electrical conduit work in basement of BRACU new campus project site.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/19711 |
相似書籍
-
Confirmation of high voltage electrical conduit work in basement of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Work interface of high voltage electrical and IFC drawing
由: Brac University
出版: (2023) -
High voltage engineering : fundamentals /
由: Kuffel, E.
出版: (2000) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)