Work interface of high voltage electrical and IFC drawing
This record consists of general correspondence regarding the work interface of high voltage electrical and IFC drawing of BRACU new campus project site.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/19707 |
Liknande verk
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Confirmation of high voltage electrical conduit work in basement
av: Brac University
Publicerad: (2023) -
The status of MEP IFC drawing
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
IFC drawing queries
av: Brac University
Publicerad: (2023) -
Revised IFC drawings impact to the construction period
av: Brac University
Publicerad: (2023)