Work interface of high voltage electrical and IFC drawing
This record consists of general correspondence regarding the work interface of high voltage electrical and IFC drawing of BRACU new campus project site.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19707 |
Registros relacionados
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Confirmation of high voltage electrical conduit work in basement
por: Brac University
Publicado em: (2023) -
The status of MEP IFC drawing
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
IFC drawing queries
por: Brac University
Publicado em: (2023) -
Revised IFC drawings impact to the construction period
por: Brac University
Publicado em: (2023)