Work interface of high voltage electrical and IFC drawing
This record consists of general correspondence regarding the work interface of high voltage electrical and IFC drawing of BRACU new campus project site.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19707 |
Documenti analoghi
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Confirmation of high voltage electrical conduit work in basement
di: Brac University
Pubblicazione: (2023) -
The status of MEP IFC drawing
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
IFC drawing queries
di: Brac University
Pubblicazione: (2023) -
Revised IFC drawings impact to the construction period
di: Brac University
Pubblicazione: (2023)