Work interface of high voltage electrical and IFC drawing
This record consists of general correspondence regarding the work interface of high voltage electrical and IFC drawing of BRACU new campus project site.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19707 |
Míreanna comhchosúla
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Confirmation of high voltage electrical conduit work in basement
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
The status of MEP IFC drawing
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
IFC drawing queries
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Revised IFC drawings impact to the construction period
de réir: Brac University
Foilsithe / Cruthaithe: (2023)