Work interface of high voltage electrical and IFC drawing
This record consists of general correspondence regarding the work interface of high voltage electrical and IFC drawing of BRACU new campus project site.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19707 |
Documents similaires
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Confirmation of high voltage electrical conduit work in basement
par: Brac University
Publié: (2023) -
The status of MEP IFC drawing
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
IFC drawing queries
par: Brac University
Publié: (2023) -
Revised IFC drawings impact to the construction period
par: Brac University
Publié: (2023)