Submission of detailed consumption breakdown for the delivered cement
This record consists of general correspondence regarding the submission of detailed consumption breakdown for the delivered cement of BRACU new campus project site.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19705 |
Ítems similars
-
Submission of detailed consumption breakdown for the delivered cement
per: Brac University
Publicat: (2023) -
Request ot submit consumption breakdown of delivered cement in our prescribed form
per: Brac University
Publicat: (2023) -
Submission of detailed consumption breakdown for the delivered OPC bulk cement
per: Brac University
Publicat: (2023) -
Submission of the cement consumption breakdown reports of BRAC University new campus project
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Submission of material consumption statement with each RA bill
per: Brac University
Publicat: (2023)