Infill material in the sunken area (CM4 locations)
This record consists of general correspondence regarding the infill material in the sunken area of BRACU new campus project.
Glavni avtor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online dostop: | http://hdl.handle.net/10361/19700 |
Podobne knjige/članki
-
Quotation for CM1 works
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Material of CM7 (RFA-515_Rev A)
od: WOHA Designs PTE LTD, et al.
Izdano: (2023) -
Regarding setting alkali resistant mesh cloth in CM6 finishing project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Business location recommendation using check-in data
od: Ahmed, Nasim Uddin, et al.
Izdano: (2018) -
Terrazzo work in BRAC University new campus building
od: Brac University
Izdano: (2023)