Infill material in the sunken area (CM4 locations)
This record consists of general correspondence regarding the infill material in the sunken area of BRACU new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19700 |
Gelijkaardige items
-
Quotation for CM1 works
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Material of CM7 (RFA-515_Rev A)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
Regarding setting alkali resistant mesh cloth in CM6 finishing project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Business location recommendation using check-in data
door: Ahmed, Nasim Uddin, et al.
Gepubliceerd in: (2018) -
Terrazzo work in BRAC University new campus building
door: Brac University
Gepubliceerd in: (2023)